Up Clearing the Forge Converting the Forge Forge Attic

Forge Attic

In the attic of the forge we intend to put two bedrooms and a shower room.  We obtained permission to install two more Velux windows in the roof to provide more light to the bedrooms.  During Easter 2013 we battened-out the attic, insulated and plasterboarded.  Then during the summer of 2013 we installed the dividing walls and in October 2013 put in a shower room, fitted the hot air circulation system and connected up the electrics.