![Forge Attic](_derived/forge_attic.htm_cmp_st-marien010_hbtn_p.gif) |
Forge Attic
In the attic of the forge we intend to put two bedrooms and a shower
room. We obtained permission to install two more Velux windows in the
roof to provide more light to the bedrooms. During Easter 2013 we
battened-out the attic, insulated and plasterboarded. Then during the
summer of 2013 we installed the dividing walls and in October 2013 put in a shower
room, fitted the hot air circulation system and connected up the electrics.
|